phase 9

End of Life

Introduction

The End of Life phase focuses on turning asset retirement, replacement, or decommissioning into an opportunity to strengthen wider social and community resilience. In doing so, it addresses how ports and connected transport infrastructure practitioners can maximise resilience value from obsolete or redundant assets, support social and environmental resilience co-benefits, and recover circular and adaptive value through reuse, recycling, and repurposing.

Resilience Objectives

The overall objective of this phase is to maximise resilience value from obsolete or redundant assets, pursued through three sub-objectives:

  • Maximise resilience value from obsolete or redundant assets. This means turning asset retirement, replacement, or decommissioning into an opportunity to strengthen wider social and community resilience.
  • Support social and environmental resilience co-benefits. This enables end-of-life choices that reduce waste, emissions, and environmental risks while creating opportunities for community, ecological, or future transport uses.
  • Recover circular and adaptive value. This involves supporting end-of-life decisions that retain value from port and transport equipment, materials, components, and spaces through (adaptive) reuse, recycling, or repurposing.

End of Life – Converting retired assets into wider resilience value

End-of-life actions create wider resilience co-benefits. Sustainable infrastructure can not only be planned, designed, constructed, and operated sustainably, but also be decommissioned with life cycle sustainability in mind[1]. Although end-of-life actions may not directly strengthen resilience of assets being decommissioned, they can create wider social and environmental resilience co-benefits. For ports and connected transport infrastructure, these can include reducing waste, lowering embodied carbon, managing environmental risks, and repurposing land for future logistics, ecological, or community uses.

Decisions in upstream phases—including policy, design, and construction—can influence how easily resilience-enhancing end-of-life approaches can later be implemented. For example, design choices and sustainability criteria such as low-carbon material, modularity, disassembly, and flexible asset use can enable future reuse, recycling, or repurposing[2]. However, this benefits from multi-decadal foresight, which is still an emerging practice in infrastructure delivery. Early climate-resilience planning in upstream phases can also reduce unexpected end-of-life decisions by lowering the risk of assets becoming stranded or prematurely unviable.

Multiple end-of-life pathways are possible, as several examples show: HafenCity (Hamburg) repurposed obsolete free-port land into a flood-resilient mixed-use district, London Docklands transformed disused docks into a financial hub, and Brooklyn Bridge Park (NY) converted retired piers into public space with capped contaminated soil. End-of-life choices such as reuse and repurposing can therefore reflect asset condition, environmental risk, system needs, and potential social, ecological, or economic value. For ports, contamination management is equally critical to safe reuse or repurposing as well, since legacy operations can leave persistent risks in land, structures, and sediments.

Note: when consulting this resource, it is important to recognise that the infrastructure life cycle is not always linear—the sequence or depth of actions can differ between projects and/or sectors.

Share this

Lead Practitioners

Government
Investors
Contractors
Owner-Operators

Governments 

Governments set policies, standards, and incentives for resilient decommissioning, circular reuse, and environmental risk management.

Investors 

Investors assess costs and benefits for end-of-life decisions for port assets.

Contractors 

Contractors execute deconstruction safely and according to technical specifications.

Owners & Operators 

Owners & operators lead end-of-life planning and execution for obsolete or redundant assets.

Key resources

The following resources have been identified as most relevant for practitioners working in the End of Life phase of climate-resilient infrastructure.

Guidance Curtin University

Developing policies for the end-of-life of energy infrastructure: coming to terms with the challenges of decommissioning (2020)

This guidance introduces the magnitude and variety of net-positive end-of-life challenges to encourage the development of reasonable policies for current and future decommissioning projects. It provides the basis for the interdisciplinary thinking involved in delivering integrated decommissioning policies that incorporate circular economy principles to maximise value throughout the life cycle of energy infrastructure.[3]

Guidance Arup

Circl-E: From Decommissioning to Regeneration (2019)

This report evaluates ways in which circular economy principles can be applied to the decommissioning of existing energy power plants, exploring the social, economic, and environmental benefits for local communities and surrounding areas. It further explores applications of circular economy principles in the design and operation of new power plants.[4]

Guidance Ellen MacArthur Foundation

Completing the Picture: How the Circular Economy Tackles Climate Change (2021)

This report illustrates, across five key areas, how designing out waste, keeping materials in use, and regenerating farmland can significantly reduce emissions. It demonstrates how businesses, financial institutions, and policymakers can build a resilient economy while playing a valuable role in reaching climate targets.[5]

Theme 1: Choose end-of-life options that build resilience

This theme addresses how practitioners can make informed, climate-aware decisions about the end of life of port and transport infrastructure. It covers systematic assessment of costs, benefits, and system-wide impacts; embedding end-of-life planning early across the asset life cycle; and preparing for unanticipated climate-related failures that may force premature retirement or replacement.

9.1.1 Assess economic, social, and environmental costs and benefits from a system-wide perspective to guide resilient end-of-life decisions for ports and connected transport infrastructure

Lead practitioners: investors, government, owners & operators

Objectives

The objective of this action is to enable resilient end-of-life decisions, guiding end-of-life choices based on climate risks, life cycle costs, and system-wide resilience impacts.

The action also seeks to maximise value beyond the individual asset by assessing economic, social, and environmental costs and benefits across port operations, connected transport networks, communities, and the environment.

Good Practices

Investors, government, and owners can consider the following good practices:

  • Multiple triggers for end-of-life decisions. A range of factors can trigger end-of-life decisions, including regulatory non-compliance, technological obsolescence, high retention cost, excess capacity, and safety risk under climate hazards.
  • Social and environmental value beyond direct economic costs. Not only direct economic costs and benefits, but also social and environmental value linked to materials, components, equipment, and space can be assessed. Benefits such as community value from repurposing waterfront land into public spaces, ecological restoration, and reduced environmental risk can be considered[6].
  • System-wide view of end-of-life impacts. Multi-modal network optimization & interdependenciesMulti-modal network optimization & interdependenciesInterdependencies between assets and how the absence of one asset could affect the wider ports and connected transport infrastructure can be considered. Multi-modal network optimization & interdependenciesMulti-modal network optimization & interdependenciesWider system impacts can be included in life cycle cost assessments, not just direct asset-level costs[7]. The right timing to start end-of-life activities can be identified while maintaining system continuity and minimum redundancy.
  • “Accept” or “abandon” as resilience strategies. Whether maintaining, protecting, relocating, or accepting reduced service or abandoning a port and transport asset provides the most resilient outcome can be evaluated. Where an asset is no longer viable under current or future climate hazards, reduced service levels, managed retirement, or replacement with a more resilient solution can be considered[6].

Process, Tools & Guidance

Identify triggers for end-of-life decisions

Identify climate-stressed assets that may require decommissioning or phase-out based on regulatory non-compliance with new emissions, technology, or production standards; technological obsolescence where climate risks were not reflected in earlier life cycle phases[8]; high retention cost where adaptation would require major reinforcement or retrofit[9]; excess service capacity exceeding redundancy needed for system resilience [10]; and safety risk where continued operation creates unacceptable risks to workers, users, or communities under climate hazards.

Relevant tools and guidelines:

  • Asset Management: An Anatomy, Version 4 (Institute of Asset Management, 2024)[10]

Assess costs, benefits, and system impacts

Define end-of-life options considering recyclability, salvage value, repurposing potential, and future system needs (Refer to 9.2.1 and 9.2.2). Multi-modal network optimization & interdependenciesMulti-modal network optimization & interdependenciesAssess life cycle costs and economic, environmental, and social impacts across ports, connected transport systems, and communities.

Relevant tools and guidelines:

  • Sustainable Procurement for Infrastructure (ASCE, 2020) – LCCA approach[9]
  • Refer to action 2.1.3 for costs and benefits assessment tools

Select timing and decision pathway

Select the preferred pathway based on resilience, cost-effectiveness, social/environmental value, and system continuity and define timing for decommissioning or phase-out while maintaining system continuity and minimum redundancy.

Relevant tools and guidelines:

  • EnABLE toolkit: assessment tool for sustainable, inclusive, and resilient infrastructure-enabling environments (UNOPS, 2024)[11]

9.1.2 Plan end-of-life pathways across upstream life cycle phases from policies and plans to design and construction to enable resilient decommissioning, replacement, or reuse of assets

Lead practitioners: government, owners & operators

Supporting practitioners: civil society, contractors, designers

Objectives

The objective of this action is to embed end-of-life resilience early in the life cycle, establishing the policy, technical, and environmental conditions early so that decommissioning, replacement, or reuse can be delivered safely and sustainably [12].

By doing so, the action also minimises the likelihood that assets become stranded or prematurely unviable—an outcome best achieved by integrating climate resilience early across upstream phases.

Good Practices

Government and owners can consider the following good practices:

  • Decommissioning before assets reach end of life. Decommissioning plans can account for climate change during design, with enabling arrangements built into procurement and construction[13] Asset management plans can be used throughout the asset’s service life to maintain and update the information needed for future decommissioning, replacement, or reuse decisions.
  • Lessons from other sectors. Lessons can be drawn from other sectors, such as energy, where decommissioning obligations and end-of-life solutions are embedded in regulation and project documentation[14]. UK OPRED [15](Offshore Petroleum Regulator for Environment and Decommissioning) –regulated decommissioning programmes benefit from asset-level plans for removal, reuse, recycling, and disposal, typically achieving > 95% recycling[16].
  • Early alignment of stakeholders on end-of-life pathways. Coordinated action across fragmented governanceCoordinated action across fragmented governanceGovernments, city authorities, users (including passengers), connected transport stakeholders, and communities can be engaged from policy and design stages to assess potential decommissioning, replacement, reuse, or repurposing pathways. Shared understanding of service, environmental, land-use, and community impacts can be built before assets approach end of life.

Process, Tools & Guidance

Build and strengthen policy and regulatory enablers

Review whether existing national strategies and plans, policies, and regulations support resilient decommissioning, reuse, repurposing, and restoration and update regulations, standards, or incentives to enable resilience-minded end-of-life pathways—for example, requirements for port land restoration or contaminated-site management.

Draw on experience from sectors where end-of-life is already regulated. Adapt the mechanisms that work there, such as mandatory decommissioning plans or recycling targets, to the port and transport context rather than starting from scratch.

Relevant tools and guidelines:

  • Planned Relocation, Disasters and Climate Change: Consolidating Good Practices and Preparing for the Future (The UN Refugee Agency, 2014)[17]
  • Making rewilding fit for policy (Pettorelli, N. et al., 2018)[18]

Establish coordination mechanisms to align on end-of-life pathways

Use the coordination mechanisms already in place with governments, city authorities, users, connected transport stakeholders, and communities to raise end-of-life early, so decommissioning, replacement, reuse, or repurposing pathways  are considered with sufficient lead time for affected parties to adapt. Establish monitoring and evaluation frameworks to track cost and environmental and social impacts[18] of these decisions, and share the results through the same mechanisms so stakeholders stay aligned as pathways develop.

Relevant tools and guidelines:

  • Envision: Sustainable Infrastructure Framework Guidance Manual (ISI, 2018)[19]

Embed decommissioning requirements in design and construction

Define end-of-life requirements during design, including disassembly, modularity, material traceability, reuse potential, and site restoration needs for marine and landside assets. Translate requirements into procurement and construction deliverables such as documentation requirements, material passports, and technical specifications.

Relevant tools and guidelines:

  • EU Construction & Demolition Waste Management Protocol (EU, 2024)[20]
  • Refer to action 5.1.1 for design and construction requirement guidelines

Maintain end-of-life information during operations

Use asset management plans to maintain information needed for future end-of-life decisions. Track condition, maintenance history, material composition, component location, contamination risks, and residual value.

9.1.3 Prepare for unanticipated climate-related failures that may accelerate asset retirement or replacement

Lead practitioners: owners

Supporting practitioners: government

Objectives

The objective of this action is to prepare for forced early retirement or replacement, recognising that severe climate-related events can render port and transport assets unusable and force abandonment, retirement, or replacement before their planned end of service.

The action also seeks to limit system-wide disruption from asset failure, Multi-modal network optimization & interdependenciesMulti-modal network optimization & interdependenciespreparing for asset failure in ways that maintain safety, reduce cascading impacts, and support continuity across ports and connected transport infrastructure.

Good Practices

Owners can consider the following good practices:

  • “Safe-to-fail” outcomes. Fail-safe approaches assume assets can withstand shocks up to a fixed threshold but may fail catastrophically once that threshold is exceeded. Moving beyond them, assets can be designed or adapted to lose function in controlled ways, Multi-modal network optimization & interdependenciesMulti-modal network optimization & interdependenciesreducing the likelihood of cascading or severe system failures[21]. Fallback arrangements can be planned, such as alternative berths, access routes, storage areas, or utility redundancy.
  • Stakeholder engagement across the system. Coordinated action across fragmented governanceCoordinated action across fragmented governancePort authorities, operators, emergency agencies, connected transport stakeholders, utilities, city governments, port and terminal workers, and affected communities can be involved in safe-to-fail planning[22]. Roles and communication protocols can be clarified in case failure forces early retirement, replacement, or service withdrawal.

Process, Tools & Guidance

Reduce premature retirement risk through upstream decisions

Use climate-informed planning, design, construction, and O&M to reduce the likelihood that port or transport assets become unusable before planned end of service. Track assets approaching unsafe or uneconomic performance thresholds through monitoring, maintenance, inspections, and asset condition data.

Relevant tools and guidelines:

Prepare for early retirement and define safe-to-fail strategies

Define thresholds for when assets can be restricted, withdrawn, retired, or replaced. Prepare service transition options, including alternative berths, rerouted access, relocated storage, utility redundancy, or temporary capacity. Link with emergency protocols to align service prioritisation, alternative operating modes, and recovery sequencing.

Relevant tools and guidelines:

  • From fail-safe to safe-to-fail: Sustainability and resilience in the new urban world (Ahern, 2011)[23]
  • The Infrastructure Trolley Problem: Positioning Safe-to-fail Infrastructure for Climate Change Adaptation (Kim et al., 2019)[24]

Set roles and communication protocols

Coordinated action across fragmented governanceCoordinated action across fragmented governanceClarify roles, decision rights, and communication protocols across owners, operators, port authorities, emergency agencies, utilities, city governments, and connected transport stakeholders.

Theme 2: Maximise circular value and manage risks

This theme focuses on recovering value from end-of-life port and transport assets while managing environmental risks. It covers material reuse and recycling, adaptive reuse of assets and spaces, and safe management of contaminated land, sediments, and hazardous materials during decommissioning.

9.2.1 Reuse and recycle material, components, and equipment to minimise waste, maximise efficiency, and strengthen resilience

Lead practitioners: owners, contractors

Supporting practitioners: government

Objectives

The objective of this action is to strengthen circular resilience across the system, applying circular economy principles to reduce waste and improve system-wide resilience to climate shocks and stresses.

It also aims to increase supply-chain flexibility through reclaimed materials, since using reclaimed materials, components, and equipment from retired port and transport assets reduces dependence on external raw-material supply chains[25].

Good Practices

Owners and contractors can consider the following good practices:

  • Policy and market enablers for circular reuse. Policies, plans, or incentives such as national circular economy plans or certification schemes can facilitate trade and use of circular products at end of life[20]. Examples such as the DGNB (German Sustainable Building Council) deconstruction certificate[26]encourage circular economy principles during the deconstruction phase.
  • Broad governance and capabilities. Full decommissioning of port infrastructure benefits from broad skills, including material recovery, quality assessment, hazardous material handling, and reuse planning[20]. Coordinated action across fragmented governanceCoordinated action across fragmented governanceGovernance arrangements across port authorities, owners, operators, contractors, recyclers, regulators, and local stakeholders can enable capacity building and skills-sharing.
  • Modular and standardised approaches. Modular and standardised design approaches during construction can make future dismounting, dismantling, reuse, and recycling easier (See action 7.1.2).

Process, Tools & Guidance

Embed circular requirements early

Identify applicable circular economy policies, regulations, standards, and certification requirements. Where they exist, apply them and pursue any relevant certifications to signal demand for circular products. Where they are absent, feed practical requirements into industry and standards bodies so enablers develop alongside practice.

Build these requirements into design, procurement, and construction from the outset, including modularity, disassembly, material traceability, and recovery specifications.

Relevant tools and guidelines:

  • The National Policy Instrument Framework (Circle Economy, 2021) – Guidance on policy instruments to facilitate circular products[27]
  • Circular Economy Action Plan (European Commission)[28]

Plan recovery and reuse pathways

Use material passports to document recoverable materials, components, and equipment including steel, concrete, utilities, and port equipment. Apply life cycle assessment to identify environmental and social co-benefits of reuse and recycling options.

Share material data across owners, operators, contractors, recyclers, suppliers, and regulators to determine where and how materials can be reused or recycled. Use the same network to build the capabilities that full decommissioning depends on, sharing these capabilities across parties through joint training and shared technical guidance.

Relevant tools and guidelines:

  • Circl-e: From Decommissioning to Regeneration (Arup, 2019) – Circular economy principles[29]
  • Materials Passports – Best Practice (Technical University of Munich/BAMB, 2019) – Guidance on material passports, LCA-based co-benefit identification, and cross-actor data sharing[30]

Execute selective deconstruction and recovery

Sort recovered materials, components, and equipment by reuse, recycling, or disposal pathway, then test quality and contamination levels before reuse. Clean or treat materials where needed, then transfer approved materials into future port, transport, or community projects.

Case Study

APM Terminals Pier 400, Los Angeles (US): Giving retired assets a second life

APM Terminals Pier 400 in Los Angeles needed to decommission a large fleet of port cranes—21 18-year-old RTG (rubber-tyred gantry) cranes and one STS (ship-to-shore) crane—to enable modernisation and decarbonisation upgrades. Conventional disposal would have forgone the significant residual asset value still embedded in the functional equipment while generating large volumes of steel, copper, and electronic waste.

To address this, APM Terminals applied a “reuse-first” hierarchy for its end-of-life assets, prioritising whole-equipment redeployment over material recycling. Eight RTG cranes were relocated within the APM Terminals network to Port Elizabeth (New York), four to T4 Argentina, and a further two RTG cranes, two top loaders, and two terminal tractors to TC Buen Columbia. Seven RTG cranes were sold to an external operator in South Africa, and one STS crane was bought back by manufacturer ZPMC for resale to a customer at the Vietnam Haipong APMT joint venture.

Through this approach, modern equipment was provided to emerging-market terminals in South Africa, Vietnam, Colombia, and Argentina at a lower cost than new builds, while avoiding the embodied carbon and energy of manufacturing equivalent new cranes. The case demonstrates that a “reuse-first” hierarchy can deliver both economic and environmental value when retiring major port equipment.

Source: APM Terminals[31]

Close

Case Study

Port of Sevilla (Spain): Turning dredged sediments into circular economy value

The Port of Seville’s waterway access, the Eurovía del Guadalquivir, requires regular maintenance dredging, generating large volumes of sediment with reuse historically focused mainly on conventional civil works.

As part of the Navigation Optimization Project (E.60.02), the Port Authority promoted beneficial reuse of dredged sediments under a “Working with Nature” model, identifying five high-value applications: wetland creation for waterbirds near Doñana National Park, ceramic floor manufacturing for bioclimatic urban use, coastal restoration at Sanlúcar de Barrameda, riverbank stabilization with seeded earth blocks, and agricultural soil improvement. The project was designed through a multi-stakeholder participatory process including sectoral roundtables and a technical-scientific committee.

The project delivered environmental and social value through new wetland habitats, coastal restoration, heat-island mitigation, and public access for citizen science and education. It also created cross-sector economic value across agriculture, ceramics/construction, tourism, and recreation.

Source: ESPO[32]

Close

9.2.2 Repurpose existing port and transport assets or spaces to support new industrial, social, ecological, or community uses

Lead practitioners: owners & operators

Supporting practitioners: contractors, users, civil society, government

Objectives

The objective of this action is to create new value from obsolete assets and spaces by repurposing retired port and transport assets or land into new uses that support industrial, social, ecological, or community needs.

Beyond repurposing individual assets, the action also helps avoid unnecessary greenfield development, since adaptive reuse reduces pressure to develop new sites—especially pristine areas or locations more exposed to climate risks.

Good Practices

Owners can consider the following good practices:

  • Adaptive reuse before redevelopment. Whether obsolete port, rail, road, or industrial assets can be transformed for new uses while retaining valuable existing features can be assessed. Industrial or social adaptive reuse options, such as logistics buffers, energy-related facilities, recycling hubs, or public space can be considered[33].
  • Nature-based and resilience-enhancing uses. Whether vacant or underused port, waterfront, or transport-adjacent land can support resilience functions can be explored[34]. Examples include bioswales and rain gardens for stormwater management, green corridors and wetlands for habitat restoration, and flood buffers for coastal protection.
  • Social and local economic benefits. How repurposing can create local employment, public access, community amenities, or new industrial activity can be evaluated. Local communities, port users, city authorities, and connected transport stakeholders can be engaged to align future uses with local needs and system requirements[35].

Process, Tools & Guidance

Identify adaptive reuse potential

Map obsolete or underused port, transport, and waterfront assets or land, assessing suitability based on location, access, constraints, and system relevance, as well as potential for nature-based uses, such as sites suited to wetlands, green corridors, or bioswales. Engage with port users, communities, authorities, and connected transport stakeholders, such as through local workshops, to identify future needs and share reuse ideas.

Relevant tools and guidelines:

  • Adaptive Reuse of Assets Model Policy (WEF, 2024)[36]
  • EPA Land Revitalization Toolkit (EPA) – Step-by-step guides and tools across the full site reuse[37]life cycle
  • Nature-based solutions for comprehensive disaster and climate risk management (UNDRR, 2024)[38]

Assess feasibility and co-benefits

Evaluate technical feasibility, climate exposure, contamination risk, land-use constraints, and delivery requirements. Quantify costs and benefits across economic, social, and environmental dimensions—for example, jobs created, housing provision, habitat restored, and flood management value.

Where nature-based reuse is being considered, assess it against additional criteria that conventional redevelopment does not require, such as the site’s physical suitability (soil, hydrology, and existing habitat), the ecological function the option is meant to deliver, and the long-term management needed to sustain it, drawing on ecological expertise.

Relevant tools and guidelines:

  • EPA Land Revitalization Toolkit (EPA) – Step-by-step guides and tools across the full site reuse[37]life cycle
  • Nature-based solutions for comprehensive disaster and climate risk management (UNDRR, 2024)[38]

Implement and monitor repurposing

Select the preferred reuse pathway and define delivery responsibilities, approvals, funding, and transition requirements. Monitor whether the repurposed asset or space delivers intended social, environmental, and resilience benefits.

Case Study

HafenCity, Hamburg (Germany): Repurposing obsolete port land into a climate-resilient urban district

 

By the early 1990s, Hamburg’s historic inner-city dock basins had become too small for modern container vessels, prompting port operations to relocate eastward and leaving 157 ha of obsolete port and industrial land stranded adjacent to the city centre. The abandoned site sat in the Elbe tidal flood zone—with existing ground level only 3.5–5.5 m above sea level—exposed to storm-surge risk that climate change was expected to intensify.

In 2000, the Hamburg Senate approved a master plan to redevelop the 157 ha site as a mixed-use district through phased development across 10 neighbourhoods from 2000 through the 2030s. All new buildings have been constructed on artificially compacted plinths raised to approximately 8 m above sea level, and pedestrian infrastructure has been raised to 7.5 m above sea level, doubling as emergency access during floods. Total investment has reached approximately €12.5 billion (public ~€2.4 billion and private ~€10 billion).

Hamburg’s downtown area has expanded by approximately 40% through the repurposing of obsolete port land. Once fully built out, the district will host ~16,000 residents and ~45,000 jobs with approximately 7,500 housing units. The project demonstrates that climate-resilient design—including flood-adaptive building levels—can be integrated into large-scale port land repurposing from the outset.

Source: HafenCity[39], Press search

Close

9.2.3 Manage contaminated land, sediments, and hazardous materials to avoid environmental and community risks during decommissioning

Lead practitioners: owners & operators

Supporting practitioners: civil society, government

Objectives

The objective of this action is to prevent environmental and community harm during decommissioning, managing persistent contamination from legacy port activities—such as fuel residues, toxic chemicals from old ship paints, heavy metals, and asbestos—before decommissioning creates exposure, pollution, or health risks.

The action also enables safe reuse, recycling, and repurposing by ensuring that port land, sediments, structures, and materials are tested, treated, and managed so they can be safely reused, recycled, or repurposed where appropriate.

Good Practices

Owners can consider the following good practices:

  • Management of contamination from upstream phases. Soil, sediment and structural contamination can be monitored and addressed continuously throughout operations[40]Site contamination registers covering location, type, and concentration of hazardous materials can be maintained to enable efficient planning when decommissioning begins.
  • Beneficial reuse wherever safe. Dredged sediments and demolition materials can be sorted by contamination level and reuse potential. Contaminated material can be treated and reused where appropriate, for example, treated sediment as input to brick and ceramic manufacturing, or cleaned demolition aggregate as fill material[41]
  • Nature-based solutions for residual contamination. Engineered containment can be combined with nature-based solutions wherever materials cannot be fully treated or reused.
  • Communication of contamination risks. Workers, regulators, local communities, city and municipal authorities, port users (including passengers), and connected transport stakeholders can be informed about contamination risks.

Process, Tools & Guidance

Assess contamination risks

Conduct pre-decommissioning audits across port land, structures, dredging areas, and connected transport infrastructure. Test soil, groundwater, sediments, and materials to identify contamination type, concentration, and exposure pathways.

Relevant tools and guidelines:

  • EPA Brownfields Road Map to Understanding Options for Site Investigation and Cleanup (EPA, 2024)[42]

Separate materials and define handling pathways

Separate hazardous materials, contaminated sediments, and demolition waste from reusable or recyclable materials. Classify materials by contamination level, treatment needs, and reuse potential.

Relevant tools and guidelines:

  • EU Waste Framework Directive (EU)[43]
  • EU Construction & Demolition Waste Management Protocol (EU, 2024)[20]

Treat, contain, or reuse safely

Apply appropriate measures, such as removal, cleaning, stabilization, capping, or engineered containment. Where contamination cannot be fully removed, pair engineered containment with nature-based solutions that manage what remains, such as constructed wetlands to sequester contaminants from runoff and vegetated caps over contamination.

Reuse approved materials or sediments in port, transport, habitat restoration, or construction applications where technical and environmental requirements are met.

Relevant tools and guidelines:

  • ISO 18504:2017 Sustainable Remediation (ISO, 2023)[44]
  • EPA Superfund Remedy Selection (EPA)[45]
  • Remediation Management of Complex Sites (ITRC, 2017)[46]

Monitor and manage residual risks

Monitor remediated sites, reused sediments, and containment measures over time. Update site contamination registers to ensure long-term protection of workers, communities, and ecosystems.

Communicate residual contamination risks and monitoring findings to those exposed or affected, including workers, local communities, city and municipal authorities, port users, and connected transport stakeholders, through channels suited to each group, and flag any change in risk promptly so it can be acted on.

Case Study

Brooklyn Bridge Park, New York (US): Transforming retired piers into a climate-resilient public waterfront

 

The East River shoreline in Brooklyn had operated as a cargo shipping and storage facility for over a century. The 85-acre site sat derelict and environmentally degraded for decades, with subsurface contamination from historical industrial activity making it unsuitable for public use without remediation. The site also faced exposure to coastal flooding and storm surges on the East River.

The project applied a “cap, salvage, and naturalise” approach rather than full excavation. Contaminated soils were capped on-site with engineered cover, eliminating the need to excavate and dispose. Pier 1 was capped with two soil layers: approximately 40,000 cubic yards of clean fill recycled from another New York City construction project at the base, topped with 18,000 cubic yards of soil specially blended for the park’s plants. Materials from the demolished cold storage buildings were reused, and the shoreline was naturalised through rebuilt salt marshes, meadows, and native plant communities, with integrated stormwater management capturing runoff for irrigation.

The project converted 85 acres of retired industrial waterfront into a civic landscape stretching 1.3 miles along the East River, with contamination safely contained without expensive landfill disposal. The case demonstrates that retired ports can be repurposed into resilience-enhancing public assets even in the presence of significant legacy contamination.

Source: Brooklyn Bridge Park[47]

Close

References

1. UNEP, 2022. International Good Practice Principles for Sustainable Infrastructure. Available at https://www.unep.org/resources/publication/international-good-practice-principles-sustainable-infrastructure

2. EU, 2024. EU Construction and Demolition Waste Management Protocol. Available at https://build-up.ec.europa.eu/en/resources-and-tools/publications/eu-construction-demolition-waste-management-protocol-2024-updated

3. Invernizzi, D. C. et al., 2020. Developing policies for the end-of-life of energy infrastructure: coming to terms with the challenges of decommissioning. Available at https://www.sciencedirect.com/science/article/pii/S0301421520304067?via%3Dihub

4. Arup, 2019. Circl-E: From Decommissioning to Regeneration. Available at https://www.arup.com/globalassets/downloads/insights/circl-e-from-decomissioning-to-regeneration-circular-strategies-for-energ-power-plants.pdf

5. Ellen MacArthur Foundation, 2021. Completing the Picture: How the Circular Economy Tackles Climate Change. Available at https://content.ellenmacarthurfoundation.org/m/3eac8667edd240cc/original/Completing-the-picture-How-the-circular-economy-tackles-climate-change.pdf

6. Global Centre on Adaptation, 2025. Climate-Resilient Infrastructure Handbook. Available at: https://gca.org/wp-content/uploads/2025/06/Climate-Resilient-Infrastructure-Handbook_20250613.pdf

7. International Coalition for Sustainable Infrastructure, 2025. R4P Port Decision Makers' Guide to Climate Risk Assessment. Available at: https://sustainability-coalition.org/wp-content/uploads/2025/11/R4P-Port-Decision-Makers-Guide_FINAL.pdf

8. IPCC, 2022. Climate Change 2022: Mitigation of Climate Change. Available at https://www.cambridge.org/core/books/climate-change-2022-mitigation-of-climate-change/2929481A59B59C57C743A79420A2F9FF

9. ASCE, 2020. Sustainable Procurement for Infrastructure. Available at: https://ascelibrary.org/doi/abs/10.1061/9780784483107

10. Institute of Asset Management, 2024. Asset Management: An Anatomy (Version 4). Available at https://theiam.org/media/5615/iam-anatomy-version-4-final.pdf

11. UNOPS, 2024. EnABLE toolkit: assessment tool for sustainable, inclusive and resilient infrastructure enabling environments. Available at https://sustainable.unops.org/si-content/enable-2

12. North Sea Foundation & Renewables Grid Initiative, 2024. Conditions for Sustainable Decommissioning of Offshore Wind Turbines. Available at https://tethys.pnnl.gov/publications/conditions-sustainable-decommissioning-offshore-wind-turbines

13. ASCE, 2023. ASCE/COS 73-23. Available at https://www.asce.org/publications-and-news/codes-and-standards/asce-cos-73-23

14. Invernizzi, D. C. et al., 2020. Developing Policies for the end-of-life of energy infrastructure. Available at https://www.sciencedirect.com/science/article/pii/S0301421520304067?via%3Dihub

15. UK Government. Offshore Petroleum Regulator for Environment and Decommissioning. Available at: https://www.gov.uk/guidance/oil-and-gas-decommissioning-of-offshore-installations-and-pipelines

16. OEUK, 2021. A decade of decommissioning: UK offshore industry to spend £16.6 billion recovering 1.2m tonnes of disused oil and gas installations from the North Sea for reuse and recycling. Available at: https://oeuk.org.uk/a-decade-of-decommissioning-uk-offshore-industry-to-spend-16-6-billion-recovering-1-2m-tonnes-of-disused-oil-and-gas-installations-from-the-north-sea-for-reuse-and-recycling/

17. UNHCR, 2014. Planned Relocation, Disasters and Climate Change: Consolidating Good Practices and Preparing for the Future. Available at https://www.unhcr.org/media/background-document-planned-relocation-disasters-and-climate-change-consolidating-good

18. Pettorelli, N. et al., 2018. Making rewilding fit for policy. Available at: https://besjournals.onlinelibrary.wiley.com/doi/pdf/10.1111/1365-2664.13082

19. ISI, 2018. Envision: Sustainable Infrastructure Framework Guidance Manual. Available at: https://sustainableinfrastructure.org/wp-content/uploads/EnvisionV3.9.7.2018.pdf

20. EU, 2024. EU Construction & Demolition Waste Management Protocol. Available at https://build-up.ec.europa.eu/en/resources-and-tools/publications/eu-construction-demolition-waste-management-protocol-2024-updated

21. Zevenbergen, C., Rijke, J., van Herk, S. & Bloemen, P. J. T. M, 2015. Room for the River: a stepping stone in Adaptive Delta Management. International Journal of Water Governance. Available at: https://journals.open.tudelft.nl/ijwg/article/view/5881/5047

22. IAPH, 2023. Risk and Resilience Guidelines for Ports. Available at: https://sustainableworldports.org/wp-content/uploads/IAPH-Risk-and-Resilience-Guidelines-for-Ports-BD.pdf

23. Ahern, 2011. From fail-safe to safe-to-fail: Sustainability and resilience in the new urban world. Available at https://slunik.slu.se/kursfiler/LK0204/10160.1314/Ahern_From_fail-safe_to_safe-to-fail.pdf

24. Kim et al., 2019. The Infrastructure Trolley Problem: Positioning Safe-to-fail Infrastructure for Climate Change Adaptation. Available at https://agupubs.onlinelibrary.wiley.com/doi/10.1029/2019EF001208

25. Ellen MacArthur Foundation, 2019. Completing the Picture: How the Circular Economy Tackles Climate Change. Available at https://content.ellenmacarthurfoundation.org/m/3eac8667edd240cc/original/Completing-the-picture-How-the-circular-economy-tackles-climate-change.pdf

26. DGNB, About the DGNB System. Available at: https://www.dgnb.de/en/certification/important-facts-about-dgnb-certification/about-the-dgnb-system

27. Circle Economy, 2021. The National Policy Instrument Framework. Available at https://www.circle-economy.com/resources/the-national-policy-instrument-framework

28. European Commission, Circular Economy Action Plan. Available at https://ec.europa.eu/environment/strategy/circular-economy-action-plan_en

29. Arup, 2019. Circl-e: From Decommissioning to Regeneration. Available at https://www.arup.com/globalassets/downloads/insights/circl-e-from-decomissioning-to-regeneration-circular-strategies-for-energ-power-plants.pdf

30. Technical University of Munich / BAMB, 2019. Materials Passports – Best Practice. Available at https://www.bamb2020.eu/wp-content/uploads/2019/02/BAMB_MaterialsPassports_BestPractice.pdf

31. APM Terminals, 2024. A responsible second life for APM Terminals port equipment. Available at https://www.apmterminals.com/en/los-angeles/practical-information/news-and-alerts/2024/240102-a-responsible-second-life-for-apm-terminals-terminal-equipment

32. ESPO, 2024. ESPO Award 2024: Let us present the shortlisted projects: Port of Sevilla. Available at https://www.espo.be/news/espo-award-2024-let-us-present-the-shortlisted-projects-port-of-sevilla

33. World Bank, 2025. Financing Climate Adaptation and Nature-Based Infrastructure. Available at: https://documents1.worldbank.org/curated/en/099050725135521570/pdf/P501013-299da78d-86cc-4f74-a095-cde17655875a.pdf

34. World Bank, 2025. Nature-Based Solutions for Ports: An Overview of NBS Implementation in Practice - Opportunities and Challenges. Available at: https://openknowledge.worldbank.org/entities/publication/f6e6b4cb-74c0-4bef-ab5c-da6cc0bdbebe

35. CRC, 2016 Integrating Maritime and Coastal Resilience. Available at: https://coastalresiliencecenter.unc.edu/wp-content/uploads/sites/845/2018/09/CRC_2016-MRS_FINAL-REPORT_07-28-2017_.pdf

36. WEF, 2024. Adaptive Reuse of Assets Model Policy. Available at https://www3.weforum.org/docs/WEF_Adaptive_Reuse_Assets_Model_Policy_2024.pdf

37. EPA, Land Revitalization Toolkit – Step-by-step guides and tools across the full site reuse life cycle. Available at https://www.epa.gov/land-revitalization/region-7-land-revitalization-resources

38. UNDRR, 2024. Nature-based solutions for comprehensive disaster and climate risk management. Available at https://www.undrr.org/publication/nature-based-solutions-comprehensive-disaster-and-climate-risk-management-toolkit

39. HafenCity, About HafenCity. Available at https://www.hafencity.com/en/overview/about-hafencity

40. Detzner, H. et al., 1996. Dredged Material Management in Hamburg. Available at https://www.iadc-dredging.com/wp-content/uploads/2017/03/article-dredged-material-management-in-hamburg-96-01.pdf

41. CEDA, 2013. Dredged Material Waste Assessment Guidelines. Available at https://dredging.org/media/ceda/org/documents/guidance/lc/lclp_dredged_material_waste_assessment_guidelines_2014.pdf

42. EPA, 2024. Brownfields Road Map to Understanding Options for Site Investigation and Cleanup. Available at https://www.epa.gov/system/files/documents/2024-06/brownfieldsroadmapepa542-r-12-001.pdf

43. EU, EU Waste Framework Directive. Available at https://environment.ec.europa.eu/topics/waste-and-recycling/waste-framework-directive_en#end-of-waste-criteria

44. ISO, 2023. ISO 18504:2017 Sustainable Remediation. Available at https://www.iso.org/standard/62688.html

45. EPA, EPA Superfund Remedy Selection. Available at https://www.epa.gov/superfund

46. ITRC, 2017. Remediation Management of Complex Sites. Available at https://rmcs-1.itrcweb.org/

47. Brooklyn Bridge Park. Sustainability – Brooklyn Bridge Park. Available at https://brooklynbridgepark.org/about/sustainability/